Post Archive

July 2018

INERCO Colombia

INERCO has carried out the Environmental Impact Study (EIS) corresponding to the El Carmen de Bolívar by-pass, a road that is part of the road project ‘Puerta de Hierro – Palmar de Varela and Carreto -Cruz de Viso’, awarded to the Concessionary Road Company Montes de María SAS (Sacyr Concesiones

Read More
Combustion Systems

Introduction One of the main challenges to be faced by the cement sector is the compliance with environmental legislation while maximising the economic profitability of its production process from the following viewpoints: Minimisation of capital and/or operating costs linked to new gas cleaning technologies. Minimisation of penalties, or even, improvement

Read More
EnvironmentINERCO Colombia

INERCO has developed the content and structure of the standard guide for the preparation of Environmental and Social Studies (ESS) of the Andean Development Corporation (ADC), the Development Bank of Latin America. Specifically, INERCO created the technical documents for a total of ten strategic sectors, an endorsement of the realization

Read More
CorporateIndustrial Safety and Risk PreventionINERCO Spain

The Industrial Safety Spanish Technological Platform (PESI) has honoured INERCO with the 2018 award for Innovative Company in Safety, awarded last Thursday during the celebration of PESI’s 10th Anniversary and the 2018 S2R Latam Forum Congress. Specifically, this recognition from PESI highlights INERCO’s work in operational reliability and safety, an

Read More