{"id":9704,"date":"2021-03-02T11:18:34","date_gmt":"2021-03-02T10:18:34","guid":{"rendered":"https:\/\/inercomunicacion.com\/?p=9704"},"modified":"2021-03-02T11:18:34","modified_gmt":"2021-03-02T10:18:34","slug":"inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile","status":"publish","type":"post","link":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/","title":{"rendered":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile"},"content":{"rendered":"<p><strong>INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by <a href=\"https:\/\/www.enap.cl\/\">ENAP<\/a> in Chile.<\/strong><\/p>\n<p><strong>INERCO has signed an agreement with the Chilean construction company Vial y Vives for the joint execution of the project to increase storage capacity at the B\u00edo B\u00edo Refinery, operated by ENAP in Hualp\u00e9n, Concepci\u00f3n (Chile)<\/strong>, awarded to Vial y Vives.<\/p>\n<p><strong>This important project &#8211; in the &#8216;Turnkey&#8217; (EPC) modality &#8211; involves the construction and commissioning of two new 50,000 m3 crude tanks,<\/strong> as well as a series of <strong>electrical supply, control and security facilities for this complex of the Chilean state hydrocarbons company.<\/strong><\/p>\n<p>This action &#8211; carried out jointly, in a modality similar to the Consortium &#8211; establishes the distribution of positions of responsibility in a joint structure. In addition, <strong>INERCO<\/strong> will take over a large part of the engineering work, as well as other consulting tasks in the territory. The approximate amount of the action is 44 million dollars (20 million direct for <strong>INERCO<\/strong>) and with an execution period of 30 months.<\/p>\n<p><strong>For <a href=\"https:\/\/www.linkedin.com\/in\/pedro-marin-aranda-inerco\/\">Pedro Mar\u00edn<\/a>, General Director of INERCO, the award of this contrac<\/strong>t \u2013the largest in INERCO&#8217;s history\u2013 <em>\u201creinforces our positioning and solvency as a global engineering company, with guaranteed human and technical capacity to face large turnkey projects in different sectors. key and as demanding as oil &amp; gas, chemical, petrochemical or electrical, while also representing an important support for this exercise, still marked by the effects of the pandemic\u201d.<\/em><\/p>\n<p>In this line, it points to INERCO&#8217;s trajectory in the field of engineering and technology during the last four decades, with large projects carried out in Europe, Latin America and Asia, for the main industrial corporations, <em>&#8220;an experience that has allowed us to develop a know-how -Own show essential to face challenges like this one with a total guarantee of success\u201d.<\/em><\/p>\n<p>On the other hand, Pedro Mar\u00edn placed special emphasis on the important link between the <strong>INERCO<\/strong> Group and Chile, <em>\u201ca country in which we have our own office since 2013 and where we have developed a good part of our most outstanding projects in recent years, both in the field environmental, safety and risk prevention consultancy, as well as that of emission control and reduction technologies and energy optimization, where we are world leaders in personalized and proven solutions and where we want to continue contributing our experience in these fields\u201d.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile. INERCO has signed an agreement with the Chilean construction company Vial y Vives for the joint execution of the project to increase storage capacity at the B\u00edo B\u00edo<\/p>\n","protected":false},"author":7,"featured_media":9700,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[105,110,147],"tags":[238,239,237],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n\" \/>\n<meta property=\"og:description\" content=\"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile. INERCO has signed an agreement with the Chilean construction company Vial y Vives for the joint execution of the project to increase storage capacity at the B\u00edo B\u00edo\" \/>\n<meta property=\"og:url\" content=\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/\" \/>\n<meta property=\"og:site_name\" content=\"Inercomunicaci\u00f3n\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-02T10:18:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"INERCOmunicaci\u00f3n\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/Inerco_\" \/>\n<meta name=\"twitter:site\" content=\"@Inerco_\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"INERCOmunicaci\u00f3n\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/\",\"url\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/\",\"name\":\"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n\",\"isPartOf\":{\"@id\":\"https:\/\/inercomunicacion.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg\",\"datePublished\":\"2021-03-02T10:18:34+00:00\",\"dateModified\":\"2021-03-02T10:18:34+00:00\",\"author\":{\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/93e7cb00d4c2035e9faf954aa9a9f53f\"},\"breadcrumb\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage\",\"url\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg\",\"contentUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg\",\"width\":2560,\"height\":1706,\"caption\":\"Oil tank and oil tanker with urban skyline background\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/inercomunicacion.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/inercomunicacion.com\/#website\",\"url\":\"https:\/\/inercomunicacion.com\/\",\"name\":\"Inercomunicaci\u00f3n\",\"description\":\"Noticias de INERCO\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/inercomunicacion.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/93e7cb00d4c2035e9faf954aa9a9f53f\",\"name\":\"INERCOmunicaci\u00f3n\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/favicon_INERCO_114.png\",\"contentUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/favicon_INERCO_114.png\",\"caption\":\"INERCOmunicaci\u00f3n\"},\"sameAs\":[\"https:\/\/www.inerco.com\",\"https:\/\/www.linkedin.com\/company\/inerco-s.a.\",\"https:\/\/twitter.com\/https:\/\/twitter.com\/Inerco_\",\"https:\/\/www.youtube.com\/channel\/UCkGls-e-j4V57RWNJNKAS1g\"],\"url\":\"https:\/\/inercomunicacion.com\/en\/author\/inercomunicacion\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/","og_locale":"en_US","og_type":"article","og_title":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n","og_description":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile. INERCO has signed an agreement with the Chilean construction company Vial y Vives for the joint execution of the project to increase storage capacity at the B\u00edo B\u00edo","og_url":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/","og_site_name":"Inercomunicaci\u00f3n","article_published_time":"2021-03-02T10:18:34+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020-1024x683.jpg","type":"image\/jpeg"}],"author":"INERCOmunicaci\u00f3n","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/Inerco_","twitter_site":"@Inerco_","twitter_misc":{"Written by":"INERCOmunicaci\u00f3n","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/","url":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/","name":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile - Inercomunicaci\u00f3n","isPartOf":{"@id":"https:\/\/inercomunicacion.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage"},"image":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage"},"thumbnailUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg","datePublished":"2021-03-02T10:18:34+00:00","dateModified":"2021-03-02T10:18:34+00:00","author":{"@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/93e7cb00d4c2035e9faf954aa9a9f53f"},"breadcrumb":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#primaryimage","url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg","contentUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/iStock-538057020.jpg","width":2560,"height":1706,"caption":"Oil tank and oil tanker with urban skyline background"},{"@type":"BreadcrumbList","@id":"https:\/\/inercomunicacion.com\/en\/inerco-will-execute-the-important-epc-project-to-increase-the-storage-capacity-of-the-bio-bio-refinery-operated-by-enap-in-chile\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/inercomunicacion.com\/en\/"},{"@type":"ListItem","position":2,"name":"INERCO will execute the important EPC project to increase the storage capacity of the B\u00edo B\u00edo Refinery operated by ENAP in Chile"}]},{"@type":"WebSite","@id":"https:\/\/inercomunicacion.com\/#website","url":"https:\/\/inercomunicacion.com\/","name":"Inercomunicaci\u00f3n","description":"Noticias de INERCO","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/inercomunicacion.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/93e7cb00d4c2035e9faf954aa9a9f53f","name":"INERCOmunicaci\u00f3n","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/image\/","url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/favicon_INERCO_114.png","contentUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/favicon_INERCO_114.png","caption":"INERCOmunicaci\u00f3n"},"sameAs":["https:\/\/www.inerco.com","https:\/\/www.linkedin.com\/company\/inerco-s.a.","https:\/\/twitter.com\/https:\/\/twitter.com\/Inerco_","https:\/\/www.youtube.com\/channel\/UCkGls-e-j4V57RWNJNKAS1g"],"url":"https:\/\/inercomunicacion.com\/en\/author\/inercomunicacion\/"}]}},"_links":{"self":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9704\/"}],"collection":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/"}],"about":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/types\/post\/"}],"author":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/users\/7\/"}],"replies":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/comments\/?post=9704"}],"version-history":[{"count":1,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9704\/revisions\/"}],"predecessor-version":[{"id":9705,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9704\/revisions\/9705\/"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/media\/9700\/"}],"wp:attachment":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/media\/?parent=9704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/categories\/?post=9704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/tags\/?post=9704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}