{"id":9776,"date":"2021-03-12T13:26:33","date_gmt":"2021-03-12T12:26:33","guid":{"rendered":"https:\/\/inercomunicacion.com\/?p=9776"},"modified":"2021-03-25T19:02:56","modified_gmt":"2021-03-25T18:02:56","slug":"inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru","status":"publish","type":"post","link":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/","title":{"rendered":"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>INERCO in Peru<\/strong> is developing two Environmental Impact Studies (EIA) and Citizen Participation Plans for the <a href=\"https:\/\/www.grupocobra.com\/peru\/\">COBRA GROUP<\/a> prior to <strong>the start-up of 220 KV transmission lines<\/strong>, with new substations and expansion of some existing ones. This new action of <strong>INERCO Peru<\/strong> in the environmental field and in social management has focused on the Pari\u00f1as line (Nuevas Tumbes, 164 kilometers along the Tumbes Region, and the Tingo line) Aguayt\u00eda, 80 kilometers in the Pucallpa Region of the Peruvian jungle.<\/p>\n<p style=\"text-align: justify;\">In the first of them, the <strong>INERCO<\/strong> team will begin with the elaboration of the biological baseline on four taxa, in the same way, it will carry out environmental monitoring at a total of nine points for the control of air quality, noise, radiation, as well as well as water.<\/p>\n<p style=\"text-align: justify;\">In the social chapter, the action for this line has achieved the approval of a <strong>Citizen Participation Plan<\/strong> considering virtual tools, such as online meetings, as well as workshops using local radios. In total, the <strong>Project contains an area comprising five provinces and eleven districts, with a population of more than 285,000 inhabitants.<\/strong><\/p>\n<p style=\"text-align: justify;\">For the <strong>Tingo Aguayt\u00eda line,<\/strong> <strong>INERCO<\/strong> will begin with the preparation of the biological baseline on four taxa, as well as environmental monitoring to control air quality, noise, radiation, soil and water quality. In the social aspect, the Citizen Participation Plan will be carried out with a scope that includes three provinces and five<strong> districts between Hu\u00e1nuco and Ucayali, with an approximate population of 101,000 inhabitants.<\/strong><\/p>\n<blockquote>\n<p style=\"text-align: justify;\">For <a href=\"https:\/\/www.linkedin.com\/in\/mrisco-licitaciones-multilaterales\/\"><strong>Mar\u00eda Risco, General Manager of INERCO Peru<\/strong><\/a>, the experience of <strong>INERCO<\/strong>&#8216;s Environmental and Social team in this type of action in Peru \u201cis a guarantee for a chapter as essential as that of the Environmental Impact Study and the Citizen Participation Plans. when facing a project of this type \u201d. In this sense, he highlights INERCO&#8217;s many references in this area in Peru, &#8220;which makes us a key ally for large companies when tackling these large-scale projects.<\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>INERCO in Peru is developing two Environmental Impact Studies (EIA) and Citizen Participation Plans for the COBRA GROUP prior to the start-up of 220 KV transmission lines, with new substations and expansion of some existing ones. This new action of INERCO Peru in the environmental field and in social management<\/p>\n","protected":false},"author":25,"featured_media":3593,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[122,117],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n\" \/>\n<meta property=\"og:description\" content=\"INERCO in Peru is developing two Environmental Impact Studies (EIA) and Citizen Participation Plans for the COBRA GROUP prior to the start-up of 220 KV transmission lines, with new substations and expansion of some existing ones. This new action of INERCO Peru in the environmental field and in social management\" \/>\n<meta property=\"og:url\" content=\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/\" \/>\n<meta property=\"og:site_name\" content=\"Inercomunicaci\u00f3n\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-12T12:26:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-03-25T18:02:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1263\" \/>\n\t<meta property=\"og:image:height\" content=\"560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Maria Risco Nardiz\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Inerco_\" \/>\n<meta name=\"twitter:site\" content=\"@Inerco_\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Maria Risco Nardiz\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/\",\"url\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/\",\"name\":\"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n\",\"isPartOf\":{\"@id\":\"https:\/\/inercomunicacion.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg\",\"datePublished\":\"2021-03-12T12:26:33+00:00\",\"dateModified\":\"2021-03-25T18:02:56+00:00\",\"author\":{\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/d6d325f4cf030636f44613c4f26e144b\"},\"breadcrumb\":{\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage\",\"url\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg\",\"contentUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg\",\"width\":1263,\"height\":560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/inercomunicacion.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/inercomunicacion.com\/#website\",\"url\":\"https:\/\/inercomunicacion.com\/\",\"name\":\"Inercomunicaci\u00f3n\",\"description\":\"Noticias de INERCO\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/inercomunicacion.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/d6d325f4cf030636f44613c4f26e144b\",\"name\":\"Maria Risco Nardiz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/inercomunicacion.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/Maria-Risco-Nardiz-INERCO-96x96.jpg\",\"contentUrl\":\"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/Maria-Risco-Nardiz-INERCO-96x96.jpg\",\"caption\":\"Maria Risco Nardiz\"},\"description\":\"Responsable de Gesti\u00f3n de Proyectos Divisi\u00f3n Medio Ambiente INERCO\",\"sameAs\":[\"http:\/\/www.inerco.com\",\"https:\/\/www.linkedin.com\/in\/mrisco-licitaciones-multilaterales\/\"],\"url\":\"https:\/\/inercomunicacion.com\/en\/author\/maria-risco-nardiz\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/","og_locale":"en_US","og_type":"article","og_title":"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n","og_description":"INERCO in Peru is developing two Environmental Impact Studies (EIA) and Citizen Participation Plans for the COBRA GROUP prior to the start-up of 220 KV transmission lines, with new substations and expansion of some existing ones. This new action of INERCO Peru in the environmental field and in social management","og_url":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/","og_site_name":"Inercomunicaci\u00f3n","article_published_time":"2021-03-12T12:26:33+00:00","article_modified_time":"2021-03-25T18:02:56+00:00","og_image":[{"width":1263,"height":560,"url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg","type":"image\/jpeg"}],"author":"Maria Risco Nardiz","twitter_card":"summary_large_image","twitter_creator":"@Inerco_","twitter_site":"@Inerco_","twitter_misc":{"Written by":"Maria Risco Nardiz","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/","url":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/","name":"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru - Inercomunicaci\u00f3n","isPartOf":{"@id":"https:\/\/inercomunicacion.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage"},"image":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage"},"thumbnailUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg","datePublished":"2021-03-12T12:26:33+00:00","dateModified":"2021-03-25T18:02:56+00:00","author":{"@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/d6d325f4cf030636f44613c4f26e144b"},"breadcrumb":{"@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#primaryimage","url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg","contentUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/inerco-peru-desarrollo-sostenible-medio-ambiente.jpg","width":1263,"height":560},{"@type":"BreadcrumbList","@id":"https:\/\/inercomunicacion.com\/en\/inerco-develops-environmental-impact-studies-and-citizen-participation-plans-for-two-new-power-lines-in-peru\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/inercomunicacion.com\/en\/"},{"@type":"ListItem","position":2,"name":"INERCO develops Environmental Impact Studies and Citizen Participation Plans for two new power lines in Peru"}]},{"@type":"WebSite","@id":"https:\/\/inercomunicacion.com\/#website","url":"https:\/\/inercomunicacion.com\/","name":"Inercomunicaci\u00f3n","description":"Noticias de INERCO","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/inercomunicacion.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/d6d325f4cf030636f44613c4f26e144b","name":"Maria Risco Nardiz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/inercomunicacion.com\/#\/schema\/person\/image\/","url":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/Maria-Risco-Nardiz-INERCO-96x96.jpg","contentUrl":"https:\/\/inercomunicacion.com\/es\/wp-content\/uploads\/Maria-Risco-Nardiz-INERCO-96x96.jpg","caption":"Maria Risco Nardiz"},"description":"Responsable de Gesti\u00f3n de Proyectos Divisi\u00f3n Medio Ambiente INERCO","sameAs":["http:\/\/www.inerco.com","https:\/\/www.linkedin.com\/in\/mrisco-licitaciones-multilaterales\/"],"url":"https:\/\/inercomunicacion.com\/en\/author\/maria-risco-nardiz\/"}]}},"_links":{"self":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9776\/"}],"collection":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/"}],"about":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/types\/post\/"}],"author":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/users\/25\/"}],"replies":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/comments\/?post=9776"}],"version-history":[{"count":1,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9776\/revisions\/"}],"predecessor-version":[{"id":9777,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/posts\/9776\/revisions\/9777\/"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/media\/3593\/"}],"wp:attachment":[{"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/media\/?parent=9776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/categories\/?post=9776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inercomunicacion.com\/en\/wp-json\/wp\/v2\/tags\/?post=9776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}