Post Archive

June 2016

EnvironmentIndustrial Safety and Risk Prevention

Representatives of the ThermoDrill Consortium for the Horizon 2020 project held a monitoring meeting at INERCO’s head office in Seville, at which the degree of progress made in the work was analysed and the most recent achievements were pooled. This project, as part of the European Commission’s (EC) Horizon 2020

Read More
EnvironmentINERCO Peru

INERCO Peru, which carried out the environmental impact study for the Friaspata–Mollepata transmission line, has successfully completed a series of over a hundred workshops included in the citizen participation action plan for the local population. More specifically, INERCO, which advised the Friaspata–Mollepata transmission line on what form the Citizen Participation

Read More
Environmental MonitoringTechnology

INERCO offers specialised services to test the guarantees, start-up and optimisation of industrial equipment and facilities at the level of characterising emissions and parameters related to the process. These make it possible to check contractual guarantees and even to optimise the related process. These checks are essential in ensuring that

Read More